Advanced Manufacturing & Industry 4.0
Smart Line in 6 Weeks
Extra output per shift, with less overtime and fewer expedited parts.
See the full industry solution →The challenge
- • OEE is reported monthly, so losses are explained rather than prevented.
- • Changeover and micro-stops are invisible between shifts.
- • Line data exists but never reaches the people who schedule the work.
What the pilot does
- Instruments one line and establishes a true OEE baseline.
- Surfaces availability, performance and quality losses as they happen.
- Puts response work in front of the shift team, not in a report.
- Measures the move in OEE and MTTR against week one.
What we measure
Lead KPI
OEE on the pilot line
Pilot target: +5–10 OEE points; 15–20% lower MTTR†
Supporting KPIs
- • Changeover time
- • Micro-stop frequency
- • First-pass yield
† Pilot target, confirmed against your own baseline in week one. Not a guaranteed result.
One line, six weeks, one number. If OEE moves on the pilot line with the team you already have, the case for the next five lines writes itself — and if it does not, you have spent a pilot fee rather than a transformation budget.
InfinityOmnia modules used
By region
- GCC
- Free-zone industrial clusters.
- India
- PLI-scheme plants scaling new capacity.
- USA
- Reshored plants under margin pressure.
Pricing is shared after a scoping call
Launchpad is fixed-fee and fixed-timeline, but the scope depends on the site and the KPI, so we confirm it with you rather than publish a number that will not fit. The pilot fee is credited against your first-year subscription if you continue.
Already a customer? Sign in to see indicative ranges by region.
Get the white paper
Pre-filled for Advanced Manufacturing & Industry 4.0. We will route your enquiry to the team that runs this play.
